As STA Assure Gold members, we rigorously apply the STA Site Safe Strategy. This audited and proven industry approach ensures structured fire risk management and enhanced site security during construction.
We never compromise on competence. Every member of our site assembly team is fully trained to the highest industry standards and holds the relevant certifications for safe lifting and structural erection.
We have a dedicated compliance team that continuously reviews and updates our internal policies to ensure we always meet or exceed the latest UK Health and Safety Executive (HSE) regulations.
Our precision-manufactured floor cassettes and closed wall panels arrive ready to lift. This removes the need for extensive on-site cutting, reduces manual material handling and provides immediate safe working platforms for your trades.
We follow the STA’s 16 Steps to Fire Safety to ensure strict compliance and regulated site practices. We also actively design robust fire mitigation measures into our timber frames.
Yes. We provide comprehensive Risk Assessments and Method Statements (RAMS) along with detailed lifting plans prior to arriving on site.
Our £4 million facility features state-of-the-art machinery with integrated safety guarding, advanced dust extraction systems and strict operational protocols to protect our manufacturing team.